Our clients trust us with their most visible waterfront assets. Here are a few examples of the work that earned that trust.

Edgewater, FL
Waterfront park improvements along the Indian River Lagoon, including seawall restoration and public amenities.

Casselberry, FL
Erosion control and bank stabilization along Gee Creek and Howell Creek to protect adjacent properties and restore natural shoreline.

Flagler Beach, FL
Full reconstruction of the historic Flagler Beach fishing pier following damage from Hurricanes Ian and Nicole.

Daytona Beach, FL
Dock and facility restoration at Daytona Beach's premier 550-slip marina on the Intracoastal Waterway.

Tavares, FL
Phase 3 waterfront improvements at Wooten Park including boat ramp upgrades and lakefront recreation enhancements.

Starke, FL
Structural repair and rehabilitation of the Camp Blanding Joint Training Center boat ramp facility.

Big Pine Key, FL
Construction of a new public boat ramp and access facility at Bahia Honda State Park for the Florida Department of Environmental Protection.

Orlando, FL
Design-build of a water control structure to manage stormwater flow and protect downstream waterways.

Longboat Key, FL
Shoreline stabilization and erosion control along the Gulf-side perimeter of Longboat Key.

Sanford, FL
Construction of an elevated nature boardwalk through Black Bear Wilderness Area providing public access to wetland ecosystems.

Sebastian Inlet, FL
Boating access facility improvements at Sebastian Inlet.